top of page
This image depicts a drone shot of New York City taken from the air.

TECHNICAL RESOURCES

Talk to a Licensed Professional Engineer today: 646.481.1861

Search

2023 Energy Star Deadline for U.S. Commercial Buildings is this Friday December 8

  • Writer: Built Engineers
    Built Engineers
  • Dec 5, 2023
  • 1 min read


Energy Star, a company that is run by the Environmental Protection Agency and the U.S. Energy Department has set their deadline for submitting applications for 2023 Energy Star Certification for U.S commercial buildings as this Friday, December 8th. They will award 2023 certification to all successful applications received by that date. Applications received later or needing follow up or changes will be eligible for 2024 certification.


Average Processing Times

The average time to process applications is currently 15 business days, but as the deadline approaches, Energy Star expects processing times to continue to increase. They are urging applicants to apply as soon as possible to avoid delays.


For more information on the application process, view this step by step guide, How to Apply for the ENERGY STAR | ENERGY STAR, or watch a recording of a recent webinar. For any other help, visit their site at: energystar.gov.


 
 
 

Commenti


Get A Proposal

GET A PROPOSAL

Upload Project Documents
Upload supported file (Max 15MB)
Upload Images
Upload supported file (Max 15MB)

For any inquiries, questions, or recommendations, please call 646.481.1861 or send us an email and we'll get the ball rolling from there.

To apply for a job with BUILT Engineers, please send a cover letter together with your resume.

BUILT Engineers

447 Broadway, 2nd Floor #A200

New York, NY 10013

 

info@builtengineers.com

646.481.1861

© 2021 by BUILT ENGINEERS

Talk to a Licensed Professional Engineer today: 646.481.1861

  • LinkedIn
  • Instagram
bottom of page