Engineer review and markup of MEP/FP shop drawings to confirm design intent, code compliance, and coordinated installation before fabrication and fieldwork.
Comprehensive hydraulic calculations to ensure accurate pipe sizing, balanced pressure distribution, and optimal system performance for fire protection and water supply systems.
Comprehensive drainage calculations for sanitary and stormwater systems to ensure proper pipe sizing, flow capacity, and compliance with building codes and environmental regulations.
Certificate of Compliance investigations help building owners and professionals confirm legal equipment use, avoid violations, and ensure all DOB-required steps have been properly completed.
Often submitted with permit applications or utility requests, Load Letters help verify that electrical infrastructure can support current and future usage safely and efficiently.