top of page
Hand holding magnifying glass over architectural blueprint, focusing on building details. Silver ruler nearby. Technical, precise setting.

SPECIAL INSPECTIONS

Special inspections are a category of third-party inspections required by the New York City Building Code to verify that specific construction materials, systems, and methods comply with approved plans and applicable codes. These inspections must be performed by qualified, independent professionals—typically registered design professionals and technicians operating under a registered special inspection agency—who are not directly involved in the construction process.

They cover critical elements such as fireproofing, system installation and performance, occupant safety, and other life safety measures. Requirements are indicated in the project’s TR1 form, and successful completion with final sign-off is typically required to obtain a Certificate of Occupancy, Temporary Certificate of Occupancy, Letter of Completion, and close out the project.

POSITIVE PRESSURE EXHAUST AND VENT SYSTEMS IN PLENUMS AND DUCTS (BC 1705.39)

Maintains air quality and prevents potential hazardous gas accumulation in critical building spaces.

• Comprehensive testing of exhaust and ventilation systems
• Verification of pressure differential and airflow
• Assessment of plenum and duct system integrity

LUMINOUS EGRESS PATH MARKINGS (BC 1705.35 AND BC 1025.8)

Enhances emergency evacuation safety through reliable, visible guidance systems.

• Detailed inspection of photoluminescent marking installation
• Verification of visibility and durability
• Assessment of coverage and compliance with egress requirements

STANDPIPE SYSTEMS (BC 1705.30)

Affirms emergency water supply systems are fully operational for firefighting and rescue operations.

• Thorough inspection of standpipe infrastructure
• Verification of water pressure and distribution
• Assessment of connection points and system reliability

PRIVATE ON-SITE STORM WATER DRAINAGE DISPOSAL SYSTEMS AND DETENTION FACILITIES INSTALLATION (BC 1705.27.2)

Ensures effective water management, preventing flooding and environmental contamination.

• Detailed inspection of drainage system design and implementation
• Verification of detention facility construction
• Assessment of water flow capacity and erosion control

MECHANICAL SYSTEMS (BC 1705.21)

Verifies optimal performance and safety of all mechanical installations, preventing potential system failures.

• Thorough inspection of HVAC, ventilation, and air handling units
• Verification of installation and connection standards
• Assessment of system efficiency and code compliance

NON-POTABLE WATER SYSTEMS (BC 1705.38)

Verifies safe alternative water use while preventing cross-contamination risks.

• Detailed examination of water collection and distribution
• Verification of treatment and storage standards
• Assessment of system isolation and marking

CHIMNEYS AND VENTS (BC 1705.32)

Prevents potential carbon monoxide risks and ensures proper exhaust of combustion gases.

• Detailed inspection of chimney and vent construction
• Verification of clearances and material standards
• Assessment of structural integrity and gas flow

SPRINKLER SYSTEMS (BC 1705.29)

Provides critical fire protection verification, potentially reducing insurance costs and saving lives.

• Detailed verification of sprinkler head placement and coverage
• Verification of water supply and pressure requirements
• Comprehensive operational testing and flow verification

TENANT PROTECTION PLAN COMPLIANCE INSPECTION (BC 1705.26)

Protects building occupants and neighboring properties during construction or renovation.

• Detailed review of protection measures
• Verification of safety protocols
• Assessment of mitigation strategies for potential disruptions

FIRE-RESISTANT PENETRATIONS AND JOINTS (BC 1705.17)

Maintains critical fire barriers, preventing fire and smoke spread between building compartments.

• Comprehensive examination of fire stopping methods
• Verification of sealing techniques and materials
• Assessment of penetration protection standards

EMERGENCY AND STANDBY POWER SYSTEMS (GENERATORS) (BC 1705.36)

Assures critical power infrastructure remains reliable during unexpected power interruptions.

• Comprehensive generator and power system testing
• Verification of automatic transfer switch functionality
• Assessment of backup power capacity and reliability

HEATING SYSTEMS (BC 1705.31)

Confirms heating system safety, efficiency, and compliance with energy and safety codes.

• Comprehensive examination of heating equipment
• Verification of installation and ventilation standards
• Assessment of energy efficiency and operational safety

INDIVIDUAL ON-SITE PRIVATE SEWAGE DISPOSAL SYSTEMS (BC 1705.28)

Confirms proper waste management infrastructure that meets environmental and health standards.

• Comprehensive examination of waste collection systems
• Verification of sanitary and environmental compliance
• Assessment of system capacity and installation integrity

FUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS (BC 1705.22)

Prevents potential fuel-related hazards through rigorous examination of storage and distribution infrastructure.

• Comprehensive leak and integrity testing
• Verification of material and installation standards
• Assessment of corrosion protection and containment measures

SPECIAL INSPECTIONS PROGRESS INSPECTIONS
PROGRESS INSPECTIONS

GET A PROPOSAL

Upload Project Documents
Upload supported file (Max 15MB)
Upload Images
Upload supported file (Max 15MB)

For any inquiries, questions, or recommendations, please call 646.481.1861 or send us an email and we'll get the ball rolling from there.

To apply for a job with BUILT Engineers, please send a cover letter together with your resume.

BUILT Engineers

447 Broadway, 2nd Floor #A200

New York, NY 10013

 

info@builtengineers.com

646.481.1861

© 2021 by BUILT ENGINEERS

Talk to a Licensed Professional Engineer today: 646.481.1861

  • LinkedIn
  • Instagram
bottom of page